Announcement of competitive consultation on public cloud resources and transmission network lease (2025-2026) of provincial video cloud networking monitoring system of Shaanxi Expressway Toll Center

The specific qualification requirements of Contract Package 1 (public cloud resources and transmission network lease of provincial video cloud networking monitoring system (2025-2026)) are as follows:

(1) The legal person, other organization or natural person with independent capacity to bear civil liability shall provide business license/certificate of legal person of public institution/practice license of non-enterprise professional service institution/natural person ID card. The supplier shall upload the corresponding certification documents in the electronic trading system of the project as required and make an electronic signature.

(2) If the legal representative directly participates, provide the legal representative’s certificate and ID card; If the authorized representative participates, provide the power of attorney of the legal representative (with the ID cards of the legal representative and authorized representative); The unincorporated unit shall refer to the implementation. The supplier shall upload the corresponding certification documents in the electronic trading system of the project as required and make an electronic signature.

(3) provide the audited financial report for 2023 or 2024 (including audit report, balance sheet, income statement, cash flow statement, statement of changes in owner’s equity and its notes, etc., and the balance sheet at any time after its establishment can be provided if the deadline for submission of response documents is less than one year), or the credit certificate issued by the bank within six months before the deadline for submission of response documents, or the bid guarantee letter issued by credit guarantee institutions (provide any of the above three forms of information) The supplier shall upload the corresponding certification documents in the electronic trading system of the project as required and make an electronic signature.

(4) Provide the tax payment certificate or tax payment certificate paid in at least one month within one year before the deadline for submission of response documents (the time shall be based on the date of tax payment), and the tax-exempt unit according to law shall provide relevant certification materials with the official seal or special business seal of the tax authority or collection agency; Suppliers who are tax-exempt or not required to pay taxes according to law shall provide corresponding supporting documents. The supplier shall upload the corresponding certification documents in the electronic trading system of the project as required and make an electronic signature.

(5) Provide the social security fund deposit receipt paid in at least one month within one year before the deadline for submission of response documents or the social insurance participation payment certificate issued by the social security agency. Units that do not need to pay social security funds according to law shall provide relevant certification materials. The supplier shall upload the corresponding certification documents in the electronic trading system of the project as required and make an electronic signature.

(6) provide a written statement that there is no major illegal record in business activities within three years before participating in government procurement activities. The supplier shall upload the corresponding certification documents in the electronic trading system of the project as required and make an electronic signature.

(7) A commitment to provide equipment and professional technical capabilities necessary for the performance of the contract. The supplier shall upload the corresponding certification documents in the electronic trading system of the project as required and make an electronic signature.

(8) The person in charge of the unit is the same person or different suppliers with direct holding and management relations, and may not participate in government procurement activities under the same contract. The supplier shall upload the corresponding certification documents in the electronic trading system of the project as required and make an electronic signature.

(9) This procurement package does not accept consortium negotiation, and the supplier provides a non-consortium negotiation commitment letter. The supplier shall upload the corresponding certification documents in the electronic trading system of the project as required and make an electronic signature.

(10) If the cloud platform and network transmission link provided by the supplier are rented by a third party, the project authorization letter and after-sales service commitment of the corresponding cloud service provider and network operator (at or above the provincial level) shall be provided. The supplier shall upload the corresponding certification documents in the electronic trading system of the project as required and make an electronic signature.

Spring Festival travel rush Decoding: It is necessary to know the list of prohibited items for safe travel.

  Cctv newsWhen traveling by train or plane, passengers are often found to have brought some prohibited items by mistake. Let’s take a look at what we can’t take when traveling by public transport.

  Do you know what you can’t take with you by train or plane? The problem seems simple, and many cases are seized every year.

  This is the data obtained from Beijing West Railway Station, shanghai hongqiao railway station and Guangzhou South Railway Station respectively. In 2020, these three railway stations seized hundreds of thousands of contraband items respectively.

  Among them, Guangzhou South Railway Station, with the largest passenger traffic, has more than 800,000 pieces. According to the calculation of sending more than 60 million passengers last year, about one passenger in every 70 people is found to be carrying prohibited items, which are potential risks.

  Among the contraband items seized, which ones are relatively large?

  

  As you can see, "lighters" frequently appear on this list. Many people know that lighters are not allowed to be carried by plane, but they can be carried by train. However, it should be noted that the railway department stipulates that each person should carry at most two lighters to remind you not to exceed the quantity.

  Another thing that is often taken by mistake is spray, such as styling spray and sunscreen spray. What everyone needs to pay attention to is whether there is a sign of a small flame on the bottle. If there is, it is flammable and explosive, and it is not allowed to be carried on trains or planes. If there is no small flame logo, you can carry it in limited quantities.

  Another thing to pay attention to is fruit knives, blades and knives. According to the regulations, these sharp weapons that may endanger the personal safety of others are forbidden to be brought into the station.

  At present, during the epidemic prevention period, there are also misunderstandings about whether epidemic prevention materials can be carried.

  For example, alcohol, many passengers want to use alcohol to disinfect, but according to the regulations, alcohol is flammable and explosive dangerous goods, and it is strictly forbidden to carry it by car. Passengers pour into the sub-packaging bottles, and alcohol and disinfectant with unrecognizable ingredients cannot be brought into the car. Only packaged and sealed disinfectant wipes and cotton sheets are allowed to be taken on the train.

  Remind passengers on the plane that some epidemic prevention items can’t be carried with them.

  Protective equipment, such as masks, goggles and ordinary protective clothing, can be taken on the plane; Most disinfectants can’t be carried with you. If necessary, disinfectants with alcohol content less than 70% can be checked in. Another thing to say is thermometers. Electronic thermometers can be carried with you, but mercury thermometers can only be checked.

  Finally, passengers are reminded that there may be subtle differences in the regulations on contraband in different railway stations and airports. Passengers can make detailed inquiries before departure, and their accompanying articles should be carefully checked to avoid inconvenience to travel.

Notice of Hangzhou Municipal Bureau of Culture, Radio, Film and Television Tourism on Printing and Distributing the Measures for the Administration of Representative Projects of Hangzhou Municipal Int

Hangwenguang Travel [2021] No.44

District, county (city) Culture, Radio, Film and Television Tourism and Sports Bureau, relevant units:

In order to further strengthen the management of representative projects of intangible cultural heritage in our city and effectively protect the representative projects of municipal intangible cultural heritage, according to the People’s Republic of China (PRC) Intangible Cultural Heritage Law, the Regulations on the Protection of Intangible Cultural Heritage in Zhejiang Province and other relevant laws and regulations, with reference to the Administrative Measures for Representative Projects of Provincial Intangible Cultural Heritage in Zhejiang Province (for Trial Implementation), and based on the actual situation of current protection work, the Administrative Measures for Representative Projects of Hangzhou Municipal Intangible Cultural Heritage are studied and formulated. It is issued to you, please follow it carefully.

Hangzhou culture radio, film and television tourism administration

September 2, 2021   

Measures for the Administration of Representative Projects of Hangzhou Municipal Intangible Cultural Heritage

the first  In order to strengthen the protection and management of Hangzhou intangible cultural heritage representative projects (hereinafter referred to as municipal intangible cultural heritage representative projects), these measures are formulated in accordance with the People’s Republic of China (PRC) Intangible Cultural Heritage Law, Zhejiang Intangible Cultural Heritage Protection Regulations and other relevant laws and regulations, with reference to the Zhejiang Provincial Intangible Cultural Heritage Representative Project Management Measures (Trial).

the second  The term "municipal intangible cultural heritage representative projects" as mentioned in these Measures refers to the projects listed in the list of representative projects of Hangzhou intangible cultural heritage published by the Hangzhou Municipal People’s Government.

Article The municipal department in charge of culture and tourism is responsible for the management of municipal non-legacy representative projects within the city.

Under the guidance of the municipal cultural and tourism authorities, the county-level cultural and tourism authorities are specifically responsible for the management of municipal-level non-legacy representative projects within their respective administrative areas.

Article 4  According to the actual situation of the city’s intangible cultural heritage protection, the municipal cultural and tourism authorities regularly organize the identification of representative projects of municipal intangible cultural heritage. Identification of municipal non-legacy representative projects should follow the principles of openness, fairness and impartiality, accept social supervision, adhere to administration according to law, implement standardized evaluation, and strictly perform procedures such as recommendation, review, evaluation, publicity, approval and publication.

Article 5  It is recommended to declare municipal non-legacy representative projects, which shall meet the following conditions:

(1) Conforming to the definition of intangible cultural heritage in People’s Republic of China (PRC) Intangible Cultural Heritage Law;

(2) It really exists and has outstanding historical, literary, artistic and scientific values;

(3) It has the functions of enhancing the cultural identity of the Chinese nation, safeguarding national unity and national unity, and promoting social harmony and sustainable development;

(four) in a certain group or region from generation to generation, with a long history and clear inheritance context, still exists in a living form;

(five) with distinctive regional characteristics, has a greater impact in the local.

Article 6 The following materials shall be submitted when recommending municipal non-legacy representative projects:

(a) the basic situation of the project, including the project name, introduction, distribution, history, present situation, value, inheritance scope, inheritance pedigree, inheritance activities, social impact, etc.;

(two) the project protection plan, including protection objectives, measures taken and achieved results, measures to be taken, management system, etc.;

(three) the recommended protection unit, including the qualification of the protection unit, the protection commitment, and the approval opinions of the relevant inheritors (groups);

(four) the recommendation of the expert review committee on the project;

(five) project pictures and audio-visual materials, etc.

Article 7  The competent department of culture and tourism at the county level shall co-ordinate the recommendation of municipal non-legacy representative projects within its jurisdiction, and the basic procedures are as follows:

(a) selection from the county-level non-legacy representative projects;

(two) organize expert argumentation, put forward recommended projects and audit opinions;

(three) the list of recommended projects will be publicized to the public for a period of not less than 5 working days;

(four) with the consent of the people’s government at the same level, submit a recommendation report to the municipal department of culture and tourism.

Article 8  Units directly under the municipal government can make recommendations directly to the municipal cultural and tourism authorities after organizing experts’ argumentation and obtaining the consent of the competent authorities.

Citizens, legal persons and other organizations think that an intangible cultural heritage embodies Hangzhou’s excellent traditional culture and has important value, they can put forward suggestions for inclusion in the list of municipal intangible cultural heritage representative projects to the competent department of culture and tourism where the project is located, which will be reported step by step by the accepted competent department of culture and tourism, and recommended to the municipal competent department of culture and tourism according to procedures after the demonstration.

Article 9  The municipal department in charge of culture and tourism shall organize the identification of municipal non-legacy representative projects, and the basic procedures are as follows:

(a) the municipal administrative department of culture and tourism shall organize a preliminary examination of the recommended materials.

(two) the composition of the municipal non-legacy representative project expert review committee, and according to the declared project category, under the expert review committee, a number of expert review groups. The jury is composed of non-legacy experts and relevant personnel of the municipal cultural and tourism authorities. The review committee shall have 1 director and several deputy directors, and the director shall be the relevant person in charge of the municipal department of culture and tourism. The expert review team is composed of non-legacy experts of corresponding categories, and the number of members in each group is odd, with no less than 3 people in each group. The expert review team adopts the convener system, and each group has one convener.

(three) the expert review team carefully reviewed the recommended materials, and through collective appraisal, discussed and produced the primary list of municipal intangible cultural heritage representative projects, and the primary list of each corresponding category should be approved by more than half of the members of the expert review team.

(four) the review committee shall consider the opinions of the review team and put forward a list of recommendations, which shall be approved by two-thirds of the members of the review committee.

(five) the municipal administrative department of culture and tourism shall publicize the approved recommendation list to the public for public opinions, and the publicity period shall not be less than 20 days.

(six) the municipal administrative department of culture and tourism will report the list after publicity to the Hangzhou Municipal People’s government for approval and publication.

Article 10  The composition of the expert review committee and the expert review team shall be implemented in accordance with the relevant requirements of the participation mechanism of experts in the protection of intangible cultural heritage of the Ministry of Culture and Tourism. The members of the expert review committee and the expert review team shall, in the spirit of being responsible for the country and history, enhance their sense of mission and responsibility, abide by the law, be honest and self-disciplined, strictly abide by the confidentiality provisions, and shall not disclose the information and information about the review work to the outside world and sign a confidentiality agreement. Projects that directly participate in the production of application materials, or have an interest relationship with recommended projects, should be avoided.

Anyone who violates the discipline of the review work will be disqualified from participating in the review after verification, and will be removed from the review committee and expert review team.

Article 11 The municipal competent department of culture and tourism shall guide and co-ordinate the protection of municipal intangible cultural heritage projects within its jurisdiction. The competent department of culture and tourism where the project is located shall formulate the overall planning for the protection of the municipal-level non-legacy representative projects in the region, and organize the municipal-level non-legacy representative project protection units to prepare the annual protection plan, improve the protection organization system and institutional system, implement the protection responsibility, and quantify the annual protection task indicators.

The municipal non-legacy representative project recommended and declared by the municipal directly affiliated unit shall guide the project protection unit and prepare the annual protection plan and protection plan of the project.

Municipal intangible cultural heritage representative project protection planning, should be reported to the municipal department of culture and tourism.

Article 12 Municipal non-legacy representative project protection units specifically undertake the protection and inheritance of the project. The proposed list of protection units shall be put forward together when recommending projects. After being approved by the expert review team, it shall be recognized and published by the municipal competent department of culture and tourism, and awarded the municipal representative project signs.

Municipal representative project signs shall be hung and properly kept by the protection unit. Without the consent of the municipal administrative department of culture and tourism, the protection unit and any other unit or individual shall not change, copy and sublicense the signs without authorization.

Article 13 Municipal non-legacy representative project protection units shall meet the following conditions:

(a) in the municipal non-legacy representative project declaration area, in principle, should have the qualification of independent legal person;

(two) there is a person responsible for the protection of the project;

(3) Having a representative inheritor of the project or complete information of the project;

(four) the ability to implement the protection plan of the project, and the places and conditions for the inheritance and dissemination;

(five) approved by the representative inheritors or inheritors of the project.

Article 14  Municipal non-legacy representative project protection units have the following rights:

(a) hanging and preserving the municipal cultural and tourism departments unified production of municipal non-legacy representative project signs;

(two) in various activities can use the municipal non-legacy representative project logo;

(three) to participate in the formulation of project protection planning;

(four) give priority to participate in non-legacy seminars and promotion activities organized by cultural and tourism departments at all levels;

(five) according to the provisions of the declaration to obtain special financial subsidies for cultural and tourism departments at all levels;

(six) other rights that should be possessed in accordance with laws and regulations.

Article 15  Municipal non-legacy representative project protection units shall perform the following duties:

(a) in accordance with the protection plan and protection plan of intangible cultural heritage projects organized by the competent department of culture and tourism, improve the protection mechanism and system, implement protection measures, and actively carry out inheritance and dissemination activities;

(two) actively carry out project investigation, filing and practical research, and collect, preserve and display relevant physical objects;

(3) Keep close contact with the representative inheritors of the project, keep abreast of the physical and mental conditions and artistic skills of the representative inheritors, and provide guarantee support for them to carry out inheritance activities;

(4) Protecting the cultural sites on which the project depends;

(five) scientifically regulate the use of protection funds to ensure earmarking;

(six) regularly report to the local cultural and tourism authorities on the implementation of project protection and the use of protection funds, and accept supervision;

(seven) other obligations related to the protection of intangible cultural heritage.

Article 16  If the protection unit really needs to be adjusted, it shall follow the following procedures:

(a) the competent department of culture and tourism where the project is located shall organize the collective evaluation of the relevant inheritors, groups and units of the project;

(II) After the appraisal is passed, the competent department of culture and tourism where the project is located shall apply to the municipal competent department of culture and tourism, and the application materials shall include the reasons why the protection unit really needs to be adjusted, the newly recommended qualification materials of the protection unit and the commitment to fulfill its responsibilities;

(three) the municipal department in charge of culture and tourism shall organize the examination of the materials, form an expert group for deliberation, study and determine the list of protected units that really need to be adjusted, and publicize and publish it on the official website.

Article 17  Preservation institutions of intangible cultural heritage protection centers at or above the county level, municipal non-legacy representative project protection units and other related physical objects and materials shall establish and improve rules and regulations, properly keep the physical objects and materials of the project, and prevent damage and loss; And organize special research, innovate protection practices, and show protection results.

Article 18  The competent departments of culture and tourism at or above the county level shall, through the following measures, promote the protection and inheritance of municipal intangible cultural heritage representative projects:

(a) on the basis of scientific and effective protection of municipal intangible cultural heritage representative projects, encourage and support the rational use of intangible cultural heritage representative projects to develop cultural tourism products and cultural tourism services with local cultural characteristics, such as intangible tourism commodities and intangible tourism routes, expand the inheritance and consumption groups, and promote the better integration of intangible cultural heritage into modern life.

(two) under the premise of adhering to the tradition, without losing its roots, encourage and support the research and improvement of key technologies and raw materials of traditional crafts, improve the quality of traditional crafts, enhance the creative value of projects, and enhance the vitality of inheritance.

(three) for specific areas with rich intangible cultural heritage, strong atmosphere and distinctive features, cultural and ecological protection zones can be established, and the overall planning of cultural and ecological protection zones can be formulated to implement regional overall protection.

The overall planning of cultural and ecological protection areas should be incorporated into the overall planning of local economic and social development, urban and rural construction planning, and be connected with various special plans such as environmental governance, land use and industrial development.

(four) in the community, rural areas and public culture, education, sports, health and other institutions or facilities at all levels to carry out the inheritance and dissemination of municipal intangible cultural heritage projects, through exhibitions, exhibitions, education, competitions, mass media and other means to enhance the public awareness of intangible cultural heritage projects.

(five) the construction of the administrative region comprehensive intangible cultural heritage museum and learning places; Encourage municipal non-legacy representative project protection units to build exhibition and study places for the project, or set up a certain scale of research and experience sites in non-legacy tourist attractions and towns, and open them to the public.

(VI) Establish and improve the database of non-legacy representative projects, record project information truly and systematically, conduct project surveys regularly, record and store them by using modern information management means, and update relevant information such as the inheritance and dissemination activities of municipal non-legacy representative projects in a timely manner, except that it should be kept confidential according to law, which should be open to the public.

(seven) to carry out multi-sectoral cooperation in the protection of intangible heritage, to coordinate the places, environment and raw materials needed for the inheritance, promotion and operation of municipal intangible heritage representative projects, and to form a joint force for the development of intangible heritage protection.

Actively encourage and guide social forces to provide funds, places and volunteer services for the protection of municipal non-legacy representative projects.

(eight) organize the intangible cultural heritage protection training, exchange, practice and other activities attended by the municipal intangible cultural heritage protection units and inheritors in this administrative region, and improve the inheritance ability of the project protection units and municipal representative inheritors.

Encourage cooperation, co-construction and other forms to jointly carry out training and research on the protection of intangible cultural heritage with research institutions or institutions of higher learning that have the conditions for teaching and research of intangible cultural heritage and can undertake training tasks.

Article 19  The municipal administrative department of culture and tourism shall implement supervision and inspection, performance evaluation and dynamic management system for the protection and inheritance of municipal non-legacy representative projects.

Encourage citizens, legal persons and other organizations to supervise the protection and inheritance of municipal non-legacy representative projects.

Article 20  The municipal administrative department of culture and tourism shall regularly evaluate the protection and inheritance of representative projects of municipal intangible cultural heritage.

Article 21  Municipal non-legacy representative project protection units should establish a regular self-inspection and reporting system for project protection work. The competent department of culture and tourism where the project is located shall regularly supervise the implementation of the annual protection plan of the project.

The competent department of culture and tourism at the county level shall organize an annual inspection of the progress of the protection plan for municipal intangible cultural heritage representative projects within their respective administrative areas, and submit the overall survival, implementation, inheritance, use of funds, dissemination and display of the municipal intangible cultural heritage representative projects in the previous year, as well as the overall protection plan for this year’s municipal projects to the municipal competent department of culture and tourism.

The municipal non-legacy representative projects recommended and declared by the municipal directly affiliated units shall be submitted to the municipal competent department of culture and tourism every year on the project’s annual project survival, protection planning implementation, inheritance work, use of funds, dissemination and display, and this year’s project protection plan after being audited by the competent department.

Article 22 Municipal departments of culture and tourism regularly carry out spot checks on the protection and inheritance of municipal non-legacy representative projects, and the protection units that find problems in the protection and inheritance work during the spot checks should urge them to correct and rectify.

Article 23 Municipal non-legacy representative project protection units shall formulate emergency plans for emergencies and major events. The competent department of culture and tourism at the county level shall report to the competent department of culture and tourism at the municipal level in a timely manner the sudden major events that occur in the protection and inheritance of municipal intangible cultural heritage projects.

Article 24 Municipal non-legacy representative project protection units have one of the following acts, and the local cultural and tourism authorities shall make rectification within a time limit; If the circumstances are particularly serious or the rectification is ineffective, it shall be verified by the municipal cultural and tourism authorities, revoke its qualification as a protection unit, recover the municipal non-legacy representative project signs, re-identify the protection unit, and announce it to the public:

(a) ineffective protection or improper protection measures, resulting in the deterioration of the survival of municipal non-legacy representative projects or serious problems;

(two) delayed in the performance of protection duties, failed to effectively implement the municipal non-legacy representative project protection plan;

(three) distorting and derogating from the municipal non-legacy representative projects, causing adverse social impact;

(four) neglect of management, causing major conflicts between inheritors and causing adverse social impact;

(five) failing to use the government’s special funds for the protection of intangible cultural heritage in accordance with the relevant provisions;

(six) failing to submit the project protection in accordance with the relevant provisions.

Article 25  Municipal non-legacy representative projects will no longer be "alive" and die out due to changes in the objective environment, poor protection, etc., and will be approved by the municipal cultural and tourism authorities to organize experts to review and identify, report to the municipal government for approval to withdraw from the list, and make an announcement to the public.

Article 26  Individuals, units and other social organizations that have made remarkable contributions to the management, protection and inheritance of municipal intangible cultural heritage shall be commended and rewarded by the competent departments of culture and tourism at all levels in accordance with the relevant provisions of the state.

Article 27  These Measures shall be interpreted by the municipal administrative department of culture and tourism.

Article 28 These Measures shall come into force as of October 15, 2021.

I lost the Oscar for the movie Instant Universe. Jackie Chan: I don’t think it’s a pity!

Pushing off the movie "Instant Universe" lost the opportunity to win the Oscar Award. Jackie Chan replied in an interview with the media: "I don’t feel sorry!"

Yang Ziqiong, an actress, won the Oscar for Best Actress for her wonderful performance as a laundromat owner in this film, becoming the first Chinese woman to win an award in Oscar history in the past century. It is reported that Jackie Chan was originally the first choice for the role, but he pushed this excellent opportunity to others and missed the opportunity to enter the Oscar. So, does Jackie Chan feel sorry? Jackie Chan said frankly in an interview with the media, "I don’t think this is a pity!" He admitted that the director and screenwriter had invited him to play the role many times. "I know they sincerely wanted me to participate in it, but I didn’t think the script at that time was suitable for me, so I declined the invitation."

After Jackie Chan refused, the script of "Instant Universe" was rewritten, with female characters as the leading role and Yang Ziqiong as the leading role, perhaps to make up for regret. Guan Jiwei in the play has Jackie Chan’s shadow. Jackie Chan said, "I have seen this film and think that Yang Ziqiong is very suitable for this role, and the emotional connotation expressed in the film is difficult for male actors to express, so I think the film has maintained a very good standard. I don’t regret that I missed the opportunity, but I am happy. Congratulations on her doing so well! "

Jackie Chan’s new film "Dragon Horse Spirit" pays tribute to the Dragon Tiger Martial Arts Master. However, in the guest performance of the film, Jason Wu mentioned that the development of science and technology no longer requires the Dragon Tiger Martial Arts Master to risk his life to act, so does it mean that the Dragon Tiger Martial Arts Master has no future in modern movies? So have the practitioners in this industry faced an extremely difficult situation? Jackie Chan calmly responded: "Yes!" He pointed out that in a sense, in modern movies, the role of "dragon and tiger warrior" has passed. However, the industry itself will not disappear, because as long as there are action movies or action dramas, a large number of professional "dragon and tiger martial artists" will be needed to complete the action scenes instead of actors.

Jackie Chan emphasized that although technology has made great progress, it can’t completely replace the real action drama. Therefore, the profession of Dragon and Tiger Martial Arts is still very important, and for many people, it is the only source of their livelihood. Although it faces great difficulties, such an industry will not disappear easily.

"The treatment of dragon and tiger martial artists is not high, and many people insist on it all the way with their love for movies, so I took the lead in organizing the film stuntmen Association, just to gather more martial arts to speak for them!"

Editor in charge:

Guangzhou Auto Show Preview | Those models equipped with 4C and 5C rechargeable battery technology

"Charge for five minutes, talk for two hours". In the past, we could only see such a slogan in some mobile phone advertisements. With the continuous progress of battery technology in new energy vehicles, 4C and 5C batteries with "charge for ten minutes and battery life of 400 kilometers" will also meet us soon. As the Guangzhou Auto Show is about to open, this issue will take stock of the new models equipped with 4C and 5C battery technology.

image.png

So, what are 4C and 5C batteries? First, let’s find out the meaning of the letter "C". The current value required for the battery to discharge its rated capacity within a specified time can be expressed by the numerical value of the rated capacity (C), which is equal to the multiple of the rated capacity of the battery in data value, and the unit is ampere (A). For example, when the battery capacity of a car is 100Ah, the discharge current of 1C is 100 A; The discharge current of 2C is 200A, so 4C has reached 400A A.. Similarly, high discharge rate also means the improvement of battery charging ability, which is naturally of great concern to consumers. According to the calculation of power = current× voltage, on the basis of 800V high-voltage platform widely used in high-discharge rate battery models, if a battery with a capacity of 100Ah has a discharge rate of 4C, it can input a charging current of 100×4=400A, and then multiply it by 800V, which is the charging power of 320kW per hour. In other words, it only takes ten minutes to charge, and it can charge about 53.3 kWh, which brings considerable power.

Qi Rui Xing Tu Xing Ji Yuan ES: Contemporary Amperex Technology Co., Limited 4C Shenxing Supercharged Battery

image.png

"Charging for 10 minutes, battery life for 400 kilometers" in front of the article is the propaganda slogan played by Qixing Road Xingyu Era ES. Based on E0X high-performance electric platform, Star Road Star Era ES is the first China brand car with 800V high-voltage platform for mass production. It is equipped with 4C Shenxing rechargeable battery first launched by Contemporary Amperex Technology Co., Limited, and Contemporary Amperex Technology Co., Limited also characterized it as "the world’s first 4C rechargeable battery made of Ferrous lithium phosphate materials and capable of mass production". Because the positive electrode of the battery is based on Ferrous lithium phosphate material system, the cost of Shenxing 4C rechargeable battery is greatly reduced compared with that of ternary fast rechargeable battery.

Previously, Star Road Star Era ES has started blind subscription, and the blind subscription price range is 260,000-360,000 yuan.

Extreme Krypton 001 FR and Extreme Krypton 007: Contemporary Amperex Technology Co., Limited 4C Kirin Battery

image.png

Based on Krypton 001, Krypton 001 FR is a pure electric hunting coupe with performance exceeding one million fuel supercars. It is equipped with four wheels and four motors, with a maximum power of 1300Ps and a zero acceleration of 2.02 seconds. The price is only 769,000 yuan. In terms of appearance, the new car adopts a set of sporty encirclement. The front lip, the side lip and the tail wing are all made of carbon fiber, and the hub is also made of high-performance sports tires. From the face value, it is a very strong sports beast. The appearance of extreme Krypton 001 FR has further deepened the sports performance genes of extreme Krypton brand.

In terms of battery, the Krypton 001 FR is equipped with a 100kWh Kirin battery, with a maximum charging rate of 4C, which can charge the battery from 10% to 80% in just 15 minutes.

Although the car Krypton 001 FR is not limited to purchase, it is limited to 99 units per month. If we can’t grab it, we can take a look at the next one.

image.png

If Krypton 001 FR is an experimental product of 4C Kirin battery, then Krypton 007, the first car under the Krypton brand, is a sign that Krypton really starts to charge 4C quickly.

As the first medium-sized car owned by Krypton, Krypton 007 is built on PMA2+ platform under SEA architecture, equipped with 800V electrical architecture, Kirin battery, Snapdragon 8295 chip and three laser radars. The news about Krypton 007 is still limited, but with the support of PMA2+ platform and 800V high-voltage electrical architecture, the maximum charging power of Krypton 001 equipped with Kirin 4C battery is expected to reach 400kW.

The price range of the new car is expected to be about 250,000-300,000 yuan, and it will be officially unveiled at the Guangzhou Auto Show, which opened on November 17, and the pre-sale will be started simultaneously.

Wenjie M9: Contemporary Amperex Technology Co., Limited 4C Kirin Battery

image.png

On September 25th, 2023, Huawei held a new product launch conference in autumn. Yu Chengdong, chairman of Huawei, announced that the M9, the flagship SUV of Panoramic Wisdom, would be released in December 2023.

The M9 is positioned as a D-class luxury SUV. The length, width and height of the new car are 5230mm×1999mm×1800mm respectively, and the wheelbase is 3110mm. Wenjie M9 is equipped with Huawei’s advanced intelligent assisted driving system and HarmonyOS Harmony 4.0 cockpit. In terms of power, the M9 adopts a 1.5T dual-motor extended-range hybrid system and a dual-motor four-wheel drive pure electric power system. In terms of battery, the extended range version is equipped with Contemporary Amperex Technology Co., Limited battery pack, with a battery capacity of 40kWh and a pure electric cruising range of 175km;; The pure electric version is equipped with Contemporary Amperex Technology Co., Limited 4C Kirin battery, with a capacity of 97kWh and a cruising range of 630km, and supports 800V ultra-fast charging technology.

Hechuang V09: Juwan Technology 4C Fast Charging Battery

image.png

Hechuang Automobile is a new energy premium brand jointly invested by Zhujiang Investment Management Group and Guangzhou Automobile Group. It has launched three models: Hechuang 007, Hechuang Z03 and Hechuang A06. On October 13th, Hechuang Automobile’s first pure electric luxury MPV, Hechuang V09, was officially launched and delivered simultaneously. There are five versions of the new car: Deluxe Edition 620, Honor Edition 620, Honor Edition Overcharged Edition 620, Honor Edition 762 and Flagship Edition 762. The standard cruising range of CLTC is 620km and 762km respectively, and the official suggested retail price is 318,800-438,800 yuan.

Hechuang V09 comes standard with 800V high-voltage silicon carbide platform. Among them, Hechuang V09 "Honor Edition Overcharged 620" version is equipped with XFC rechargeable battery customized by Juwan Technology Research. The official said that the peak fast charging power is as high as 410kW, and the charging efficiency has reached 4C level.

Tucki X9: Contemporary Amperex Technology Co., Limited Kirin 4C Battery

image.png

Tucki X9 is Xpeng Motors’s new flagship MPV. He Xiaopeng once said that Xpeng Motors will use this model to open the "young" MPV market. Indeed, judging from the design of Tucki X9, the route taken by Tucki X9 is really different from other pure electric luxury MPVs, and the contour lines of the front and rear of the new car are more dynamic.

Coupled with Tucki’s proud advanced intelligent driving and rear wheel steering blessing, it seems that Tucki X9 will focus more on the main driving.

As for the battery, Tucki X9, like Tucki G9 and G6 before, is built by Tucki’s whirlwind architecture, and also adopts 800V high-voltage platform. The battery is ternary lithium-ion battery from Zhongchuang Singapore Airlines. According to speculation, the 4C battery technology provided by Tucki G9 should also appear on Tucki X9, and this 4C battery is still from Kirin 4C battery in Contemporary Amperex Technology Co., Limited. On the 2023 Tucki G9, the Kirin 4C battery appeared as an optional package. On the 2024 Tucki G9, the 4C battery option package disappeared. Generally speaking, whether Tucki X9′ s energy-supplementing efficiency can reach 4C still needs further information.

Zhijie S7: Jiangsu Times Power Battery

image.png

On November 9th, the first model of Zhijie brand, which Chery cooperated with Huawei, was officially unveiled and pre-sold. Four versions of Zhijie S7 Pro, Max, Max+ and Max RS were launched, with the pre-sale price starting from 258,000 yuan. It is reported that Zhijie S7 will be officially listed on November 28th.

The length, width and height of Zhijie S7 are 4971mm/1963mm/1474mm respectively, and the wheelbase is 2950 mm. It is positioned as a medium and large-sized pure electric car. The new car is equipped with a new generation of DriveONE 800V silicon carbide power platform and Huawei Turing intelligent chassis. It adopts the combination of front AC asynchronous motor and rear permanent magnet synchronous motor. The total power of the four-wheel drive version is 365kW, the torque is 679N·m, the drag coefficient Cd is only 0.203, and the acceleration of 100 kilometers is only 3.3s s.

As for the battery, no more information is disclosed at present, but the official claims that the overcharged model can increase the cruising range by 200+km after charging for 5 minutes, which has basically reached the charging level of 4C. It is worth mentioning that the power battery pack carried by Zhijie S7 is a mix of lithium ternary battery and lithium iron phosphate battery, and its power battery supplier is Jiangsu Times, which is actually a wholly-owned subsidiary of Contemporary Amperex Technology Co., Limited.

Ideal MEGA: Contemporary Amperex Technology Co., Limited Kirin 5C battery

image.png

The ideal first pure electric MPV model-the ideal MEGA is quite hot, and the new car will also be booked at the Guangzhou Auto Show. It can be said that in addition to the appearance of a high-speed train locomotive, the concept of "5C" seems to be the beginning of the ideal MEGA. As the saying goes, "literature is no first, martial arts is no second". When it comes to 5C, people will think of the ideal MEGA first, and this label is even labeled. Of course, the ideal MEGA is not only popular in off the charts, but also has many mysteries. What we can know is that it is expected to be equipped with Contemporary Amperex Technology Co., Limited Kirin 5C battery for the first time, with a peak 5C charging rate, a peak charging current of 700A+ and a peak charging power of 520kW+. The official claim is that it has "brought the fastest charging speed of electric vehicles in the world-charging for 500 kilometers in 12 minutes".

Wubo HT: Haobo 5C Flash Rechargeable Battery

image.png

Haobo HT is the third model of Haobo brand. It is positioned as a medium and large pure electric SUV, and it was officially launched on November 15th, with a price of 213,900-329,900 yuan. The new car is built on the pure electric platform of AET3.0 and the electronic and electrical architecture of Spirit. The length, width and height of Haobo HT are 4935x1920x1700mm and the wheelbase is 2935mm, which really gives everyone a big surprise.

In addition, another killer configuration of Haobo HT is that it is equipped with an overcharged battery of up to 5C, which is officially called Haobo 5C flash charging technology. This is a set of closed-loop technology from recharging to battery. It is officially claimed that it can charge for 8 minutes and last for 400+ kilometers, and it will land earlier than the ideal MEGA.

Write at the end:

At the presentation conference of Zhijie S7, Yu Chengdong described the charging of Zhijie S7 as follows: charging for 5 minutes can last for 200+km, and charging for 15 minutes can last for 400+km. Take a closer look, that is to say, the approximate 4C charging power that Zhijie S7 can actually achieve may be 5 minutes in an ideal situation, and the charging power for the next 10 minutes will become 2C; For another example, the charging rate advertised by the ideal MEGA at first was not 5C, but 4C, but after it was changed to 5C, the heat of the ideal MEGA reached the second peak after its appearance was announced.

Higher fast charge rate is naturally the focus of current technical research, but from the consumer’s perspective, the actual experience of recharging is equally important. Only by the long-term word-of-mouth accumulation of users can we know more real feedback. I hope that the fast charging technology of "charging for 10 minutes and cruising for 400 kilometers" can be popularized on a large scale and really change people’s travel life.

Giant pandas arrive in Beijing on National Day (photos)


  The National Day Giant Panda was interviewed. At 7: 10 last night, six National Day pandas arrived at the Olympic Panda Pavilion in Beijing Zoo and started their one-year trip to Beijing. "A lot of time is robbed." Zhang Jinguo, deputy director of the Beijing Zoo, said that in order to reduce the travel fatigue of giant pandas, the big trucks carrying pandas entered the Fifth Ring Road ahead of schedule. At 8 am on May 1, they will meet with tourists. Our reporter Wang Shenshe



The breeder replenished water for the National Day giant panda who just got off the plane.



The breeder from Ya ‘an leads the panda into the barn of Beijing Zoo.



After the giant pandas arrived in Beijing on the National Day, the quarantine officers were visually inspecting their health.



  A giant panda climbed up the railing as soon as it entered its new home on National Day. Yesterday afternoon, six National Day giant pandas arrived in Beijing, and will meet with tourists at 8 am on May 1.



The truck carries the giant panda on National Day to the zoo.


  Time: afternoon of April 29th.


  Venue: Capital Airport to Beijing Zoo


  Event: Six National Day pandas arrived in Beijing.


  At 7: 10 last night, six National Day pandas arrived at the Olympic Panda Pavilion in Beijing Zoo and started their one-year trip to Beijing.


  At 7 o’clock yesterday morning, the panda was caged and transported from Ya ‘an to Chengdu Shuangliu Airport, and flew to Beijing in the afternoon. At 4: 37 pm, the plane landed. In the next two and a half hours, the staff quickly completed the process of delivery, quarantine and transportation.


  "A lot of time is robbed." Zhang Jinguo, deputy director of the Beijing Zoo, said that in order to make the pandas feel less tired during the journey, trucks carrying pandas also drove into the Fifth Ring Road during the no-go period.


  At 8: 00 am on May 1, six National Day pandas will meet with tourists.


  The delivery time is shortened by 1 to 2 hours.


  At 5: 33 pm yesterday, six National Day giant pandas were transported to the cargo terminal of the Capital Airport.


  "The normal delivery time takes 2 to 3 hours." Lu Lili, deputy general manager of Air China’s Beijing operation base, said, however, the delivery of national treasures is a special event, so it is one to two hours shorter than the normal delivery time.


  Outside, Zeng Youlin, deputy section chief of the air transport quarantine supervision department of Beijing Animal Health Supervision Office, is waiting. The transport of live animals must be stamped with the aviation visa and personal stamp by the quarantine supervision station of the capital airport where he is located before he can pick up the goods and enter Beijing.


  Zeng Youlin said that it is necessary to check the quarantine certificate issued by the place of origin first, and then visually observe the health of the animals.


  About five minutes later, the pandas successfully obtained the "passport" to Beijing. Generally, this process takes about 1 hour.


  The van carrying the panda broke through the Fifth Ring Road in advance.


  When Zeng Youlin inspected the goods, the breeder Yang Haidi lost no time to feed the pandas with mineral water, apples, carrots and other things.


  "Mainly to replenish water." Yang Haidi said that six giant pandas didn’t drink water all afternoon. At about 7: 20 am yesterday, they were caged and fed once after arriving at Chengdu Shuangliu Airport from Ya ‘an.


  At 5: 50 pm, the giant panda was loaded and went to Beijing Zoo.


  As the truck is in the no-go period, the driver suggested finding a place to park to avoid violating the rules.


  "Can’t wait any longer." Zhang Jinguo, the accompanying deputy director of Beijing Zoo, felt that the pandas should be sent to the zoo as soon as possible to have a good rest. He decided to venture into the Fifth Ring Road. If the police intercepted him, he would try to win the understanding of the other party. If he was photographed by an electronic eye, the fine would be reimbursed by the unit.


  In this way, take the airport north line, Jingcheng Expressway, North Third Ring Road to Lenovo Bridge, take Zaojunmiao Road, and enter Beijing Zoo from the north gate.


  "Look, it’s a giant panda." Along the way, many vehicles followed the transporter and took out cameras and DV to shoot.


  At 7: 05 last night, the van carrying giant pandas stopped in front of the Olympic Panda Pavilion. Subsequently, six giant pandas were carried into the animal house and enjoyed dinner.


  Zhang Jinguo said that they will meet the tourists at 8 am on May 1.


  This edition was written/Our reporter Lin Wenlong This edition of photography/Our reporter Wang Shen

Editor: Li Xiuwei

Summary of the reform effect of industrial and commercial registration system

The "blowout" growth of new enterprises stimulates market vitality —— A summary of the reform effect of industrial and commercial registration system

Xinhua News Agency, Beijing, July 24th (Reporter Gao Jing, Tan Moxiao, Meng Hanqi) After the implementation of the reform of the registered capital registration system, from March to June, 4,400,600 new market entities were registered nationwide, a year-on-year increase of 20.48%. Among them, there were 1,269,300 newly registered enterprises, an increase of 66.85%. The number of enterprises has increased by spurt, and the market vitality has been further released, which has played an important role in stabilizing growth and promoting employment.

    The reform of registered capital registration system stimulates a new upsurge of entrepreneurship

"The reform of industrial and commercial registration has made my dream of starting a company come true." Chang Zhaosheng, a 70-year-old man from Jilin Province, said.

Before the reform, Chang Zhaosheng had patented technology in video recording equipment, but he was unable to apply for registration as a company due to lack of funds. The reform of the registered capital registration system canceled the minimum requirement of the registered capital of the company, and no longer restricted the initial investment amount, investment proportion and investment period of the company’s shareholders. Chang Zhaosheng successfully obtained the business license, and his registered capital was all composed of intangible assets.

The reform of the registered capital registration system, which was implemented on March 1st this year, has greatly reduced the entry threshold for registered capital and business premises of enterprises, and enabled more people with "entrepreneurial dreams" like Chang Zhaosheng to realize their dreams.

The new entrepreneurial upsurge has also brought vitality to economic development: the number of service enterprises in China has increased significantly; The number of market players in the central and western regions has increased significantly faster than that in the east; It has an obvious driving effect on emerging industries such as information transmission, software and information technology, culture, sports and entertainment.

A large number of new individual and private economies have also become the main channel to solve employment. By the end of June, the number of individual and private economic employees in China had increased by 13,034,600 compared with the end of last year, an increase of 3.88 times over the same period of last year.

    "Take a photo first, then prove it" to clear up the "obstacle" of entrepreneurship

"In the past, it took a lot of procedures to run a restaurant license. This time, it didn’t take me 30 days to officially open the restaurant." Feng Hongjun, owner of Dangjun Restaurant in Banan District, Chongqing, said.

Chongqing has fully implemented the industrial and commercial registration reform since January 28 this year, becoming one of the first provinces and cities in China to fully implement the industrial and commercial registration system reform. After hearing this information, Feng Hongjun, who has been drifting north for more than ten years, chose to return to his hometown to start a business. After obtaining the business license from the industrial and commercial department, he applied for a license from the food and drug supervision department while decorating, recruiting and purchasing equipment. When the renovation was completed, all the formalities were completed and the restaurant opened smoothly.

The the State Council executive meeting held on June 4th decided to continue to clean up and compress the existing pre-approval items, change most of them into post-approval, and change from "first license before photo" to "first license after photo", and implement a catalogued management system, which will be open to the public and subject to supervision.

Liu Junhai, director of the Institute of Commercial Law of Renmin University of China, pointed out that "taking photos first and then obtaining certificates" can improve the company’s survival rate and promote the company to carry out commercial activities as soon as possible. This reform is not a simple mechanical displacement of the examination and approval system and the registration system in the time dimension, but a major institutional innovation that comprehensively reduces and restricts the government’s examination and approval power, reconstructs public power and enhances the government’s credibility, and contains great positive energy for reform and innovation.

    "lenient entry and strict management", exploring the balance between management and release in practice

After lowering the entry threshold, corporate integrity has become one of the most concerned issues in society. This tests the management level of the government.

Wang Yukai, a professor at the National School of Administration, said that how to achieve the balance between management and release, not only to encourage entrepreneurship and stimulate market vitality, but also to maintain market order and avoid the strange circle of "management will die and release will be chaotic" is a difficult problem that the government must solve under the new situation.

The Provisional Regulations on Enterprise Information Publicity (Draft) adopted by the executive meeting in the State Council on July 23rd proposed to speed up the implementation of the enterprise information publicity system, rely more on establishing a transparent and honest market order to regulate enterprises, create a fair competitive market environment, and make credit the "foundation pile" of the socialist market economic system. Experts believe that this will help to further deepen the reform of the industrial and commercial registration system and straighten out the relationship between the government and the market.

According to the reporter’s investigation, Chongqing started to develop and build a joint credit information system for enterprises, and collected and integrated 26.773 million pieces of enterprise credit information. Through the application of enterprise credit information data in engineering construction, government procurement, land transaction, drug transaction, and approval of financial funds related to enterprise subsidies, the behavior of enterprise dishonesty is effectively restrained, and a strict management work pattern of "one place is untrustworthy and everywhere is limited" is initially formed.

Don’t be fooled by folk names, take stock of mobile phones with many nicknames

introductionIn today’s complex model world, mobile phone models, R & D codes, folk nicknames, and other names make many users feel overwhelmed. In fact, the folk names of many mobile phones make editors very confused, making it even more confusing for users who go to the mobile phone market to buy a phone. Many friends are also fooled by folk names, and they don’t know which mobile phone they want to buy. ZO Channel is sharing with you today the various names of the hottest mobile phones. Friends who plan to buy a phone can understand at a glance, and will never be fooled by folk names again.


Don't be fooled by folk names, take stock of mobile phones with many nicknames

Big Bad = HD = Desire HD = G10

HTC Desire HD is actually the domestic licensed product of the international version of HTC, and it is also HTC’s tenth smartphone (actually not the tenth strictly speaking), so it is also called G10, and an unknown model is HTC A9191. The abbreviation of this machine is DHD, which is also known as the big bad guy. The powerful performance is still very friendly with this funny nickname (the bad guy dare not say it, but it is indeed big enough). Now the machine is selling hot, and there are various names on the market. Friends who are ready to buy it should not be confused.

4.3-Inch metal flagship HTC Desire HD is on sale
The picture shows the HTC HD.

HTC Desire HD uses a straight board full touch design, and the all-metal integrated body feels very good, especially suitable for men. The 4.3-inch screen is quite domineering, with a resolution of 480 * 800 pixels, the details and visual experience are eye-catching, and it also supports multi-touch. The 1GHz Qualcomm second-generation Snapdragon MSM8255 has powerful computing power, and the 45nm process power consumption is lower. RAM has reached the level of 786MB, running multi-tasking more smoothly, the 3D graphics acceleration performance of the Adreno 205 is also extremely sturdy, and the multimedia and gaming experience is even better. The camera is eye-catching, supports autofocus and dual LED support, and can record 720P video. On the network, it supports WIFI and navigation.

4.3-Inch metal flagship HTC Desire HD is on sale 4.3-Inch metal flagship HTC Desire HD is on sale
The picture shows HTC Desire HD

4.3-Inch metal flagship HTC Desire HD is on sale 4.3-Inch metal flagship HTC Desire HD is on sale
The picture shows HTC Desire HD

Editor’s comment:

Big Bad uses Qualcomm’s top-of-the-line core solo 1GHz processor, RAM has reached an unprecedented 768MB, which is really powerful in games and multimedia. The 4.3-inch large screen has many advantages when browsing a web and playing games, but it is also relatively strong. Friends who like this machine can refer to it.

HTC Desire HD (Modifier)
[ReferencePrice] 3150 yuan
[SalesMerchant] Bright Mobile Network
[Business phone] 13141221273
[Store address] 1706A, 17th Floor, Zhongguancun Science and Trade Office Building

1. Are you satisfied with the performance and functionality of your existing mobile phone? Very satisfied Not very satisfied 2. Are you happy to use a phone supported by Qualcomm Snapdragon chips for stronger performance and more features? I would love to. Let’s see

Stone = Milestone 2 = Milestone 2 = MS2

The Chinese name of the Motorola Milestone 2 is Milestone II. Because there is a Stone after the name, it is also affectionately referred to as a stone (metal stone, ORZ) by netizens. It is also directly referred to as MS2 in forums and other areas (it seems different from the Internet language). The Motorola Milestone 2 uses the 1GHz TI OMAP 3630, which has strong performance. The new 2.2 system is even more desirable, and it is quite popular among netizens.


Excitingly, the Motorola Milestone 2 drops to freezing point
Pictured here, Motorola

The Motorola Milestone 2 adopts the classic side-sliding QWERTY full design, and the metal body is very textured. The screen is a 3.7-inch capacitive touch screen, the resolution reaches the level of FWVGA, the display effect is clear, and it supports multi-touch operation. The Android 2.2 version of the system is very powerful, supports Flash video and wireless AP functions, and has excellent expansion capabilities. The 1GHz processor is powerful, and the 512MB RAM is also very mainstream, supporting 3D graphics acceleration. The Motorola Milestone 2 has a camera on the rear, and the imaging effect is mainstream, fully capable of meeting the needs of mainstream users. Network and WIFI are also supported, and navigation is quite practical.

Surprisingly, Motorola Milestone 2 is less than 2700 Surprisingly, Motorola Milestone 2 is less than 2700
Pictured, Motorola Milestone2

Surprisingly, Motorola Milestone 2 is less than 2700 Surprisingly, Motorola Milestone 2 is less than 2700
Pictured, Motorola Milestone2

Editor’s comment:

Motorola Milestone 2 is a very popular Android 2.2 system with rich applications and no worries about resources. The 1GHz main frequency processor is quite eye-catching in multi-tasking and multimedia, and friends with higher performance requirements can consider it.

Motorola Milestone 2 (remodel)
[Reference] 2680 yuan
[SalesMerchant] Ruifeng Telecom
[Business phone] 010-82667058 075583639058
[Store address] Room 1080, 10th Floor, Block C, E World, Zhongguancun, Beijing, Shenzhen Huaqiang South Petroleum Building


Princess Diana === Xiao Wu


    Needless to say, it is one of the most popular at present, and has a very high status in the system camp. The English translation of Defy into Princess Diana is relatively easy to understand. The licensed model is Motorola ME515, so it is also directly called Xiao Wu by the people, so it is not easy to confuse.


   
Hot three-proof intelligence, Motorola Defy stable price reproduction
Pictured, Motorola Defy


    Motorola Defy is a three-proof, stylish and compact body design, delicate feel. The 3.7-inch screen definition reaches 480 * 854 pixels, the display effect is delicate, and multi-touch is not a problem. Motorola Defy uses TI OMAP 3610, running speed is good, RAM is 512MB level, running speed is very fast, 3D graphics acceleration is also supported, and the performance on the game is quite strong. The configuration is the current mainstream configuration, which can meet the needs of users. Upgrade to Android 2.2 version can use a lot of functions, especially autofocus and Flash and wireless AP functions are also available.


Hot three-proof intelligence, Motorola Defy stable price reproduction Hot three-proof intelligence, Motorola Defy stable price reproduction
Pictured, Motorola Defy


Hot three-proof intelligence, Motorola Defy stable price reproduction Hot three-proof intelligence, Motorola Defy stable price reproduction
Pictured, Motorola Defy


Editor’s comment:


    Motorola Defy is a very popular Android system smartphone. The new 45nm TI OMAP3610 processor is based on the Cortex A8 core, and Motorola has added 3D graphics acceleration to it, which is more powerful overall. But as a three-proof phone, Motorola Defy’s more charm is reflected in its strong adaptability. Recently, the price of the machine has fallen again, which is still worth considering.


Motorola Defy (Modifier)
[Reference] 2150 yuan
[SalesBusiness] Beijing Aolong Xinchuang Technology Development Co., Ltd.
[Merchant phone] 010-82535031
[Store Address] 1506A, 15th Floor, Zhongguancun Science and Trade, Haidian District, Beijing



=== G8


    The HTC A3366 is HTC’s eighth Android smartphone, also known as the G8 (the author’s female colleagues have also been asked if they have used the G8, embarrassing). It has to be said that this HTC A3366 is quite popular in the low-end market.



HTC A3366
The picture shows the HTC A3366.


    HTC A3366 adopts a straight board full touch design, the specially coated body has an excellent feel, and the body is small and round. The screen is a 3.2-inch capacitive touch screen, but the resolution is only the level of QVGA, and the display effect is average, but multi-touch is still supported. Android 2.2 version of the smart, has a strong expansion ability, Flash playback and wireless AP support. Qualcomm 528MHz performance is average, but basically enough. In terms of network, HTC A3366 supports network, WIFI and navigation are also supported, and the comprehensive quality is comprehensive.


HTC A3366 HTC A3366
The picture shows the HTC A3366.


HTC A3366 HTC A3366
The picture shows the HTC A3366.


Editor’s comment:


    HTC A3366 is a cost-effective Android system smartphone with a stylish and exquisite design. It is also equipped with the latest Android 2.2 version of the smart operating system, which is very playable. In terms of network, HTC A3366’s configuration is also excellent, and it also has a rear camera, which is comprehensive in quality.


HTC A3366 (licensed)
[Reference] 2639 yuan (with ticket)
[SalesMerchant] Gaohong Mall
[Related Links] Click to buy



Love Crazy == IP4


    4 According to its English translation, it is directly called "Love Crazy Death" by many netizens (there are many fruit fans who are crazy about 4 looking for death and life), and of course there are also directly referred to as IP4. This one has been on the market for almost a year and is still hot and very strong. It is a fashion masterpiece worth buying. Friends who like this one generally will not be confused.



Apple iPhone 4
Picture 4


    Apple iPhone 4 has a desirable stylish appearance, and a large number of applications of straight lines make the fuselage more sharp than Apple iPhone 3GS and other models. The 3.5-inch screen is still the old size, but the resolution is very high, reaching 640 * 960 pixels, and the display effect is very clear. The i OS system is still upgraded to version 4.3, which can provide a large number of software on the App Store, and the entertainment effect is eye-catching. The 1GHz Apple A4 is very efficient, with 512MB of RAM space, and supports the function of 3D graphics acceleration. The rear camera has a good imaging effect, and supports 720P video recording. Network is supported on the network, WIFI and navigation are supported.


Apple iPhone 4 Apple iPhone 4
Pictured, Apple iPhone 4


Apple iPhone 4 Apple iPhone 4
Pictured, Apple iPhone 4


Editor’s comment:


    Apple iPhone 4 is a very popular mobile phone with high attention. Although the price has been firm and there is no sign of decline, it is still worth buying. Today’s licensed price is 5550 yuan, which is cost-effective. Friends who like it may wish to pay more attention.


16GB Apple iPhone 4 (licensed)
[ReferencePrice] 5550 yuan (with ticket)
[SalesMerchant] Hongda Mobile Network
[Business phone] 13910686395
[Store address] Room 1516A, 15th Floor, Office Building, Zhongguancun Science and Trade Electronic City, Haidian District, Beijing



Meijiu == Jiumei


    The 9 was extremely popular among many domestic players. Although it was the second smartphone, its performance and overall quality were quite outstanding. The 1GHz and ultra-high resolution display screens were all major features.



The chip flash memory battery is in a hurry, and the mobile phone is out of stock after the earthquake in Japan
Pictured, Meizu M9


    The Meizu M9 adopts a straight board full-touch design, and the plastic body still feels outstanding. The screen of the Meizu M9 is a 3.5-inch ASV screen with a resolution of 640 * 960 pixels. The display effect is very clear and supports multi-touch. The performance of the Meizu M9 is also very strong. The 1GHz processor performance is sturdy, and it also supports 3D acceleration. It can smoothly play 1080P movies, which is eye-catching. The camera effect is average, and daily photography is enough. The Meizu M9 supports WIFI and navigation perfectly, and can be used under China Unicom’s network.


The chip flash memory battery is in a hurry, and the mobile phone is out of stock after the earthquake in Japan  The chip flash memory battery is in a hurry, and the mobile phone is out of stock after the earthquake in Japan
Pictured, Meizu M9


The chip flash memory battery is in a hurry, and the mobile phone is out of stock after the earthquake in Japan  The chip flash memory battery is in a hurry, and the mobile phone is out of stock after the earthquake in Japan
Pictured, Meizu M9


Editor’s comment:


    The appearance of the Meizu M9 is relatively fashionable, and it is a high-quality work among domestic mobile phones. The 1GHz processor has strong performance and 512MB of RAM support. The 3D accelerator is more convenient for games and video playback (multiple videos are played directly), and it is more cost-effective for domestic users.


8GB Meizu M9:2499 yuan
16GB Meizu M9:2699 yuan
[Purchase address] Meizu stores around the world



Wife Demon == Xiao Qi


    As a revival masterpiece of the Nokia E series, the third edition of Nokia has become popular again. The 1 is also affectionately called Wife Demon (71, such a quirky and fantastical name) by users. The design of the full keyboard of this machine is very intimate, the functions are practical, and the battery life is also quite excellent. It is a very classic S60.



Nokia E71
Pictured, Nokia E71


    The Nokia E71 was launched in 2008 and still has a large number of users today, which shows the popularity of the machine. The Nokia E71 is made of metal body, and the input of the QWERTY full keyboard is excellent. On the screen, the Nokia E71 has a 2.4-inch resolution of 240 × 320 pixels TFT screen. On the system, it is still equipped with Symbian S60, which has a comprehensive expansion capability. The Nokia E71 has a built-in 369MHz, which runs very fast. The rear 3.20 million pixel camera works well and has a certain entertainment. As for applications such as Bluetooth, it also has excellent battery life with a 1500mAh battery.


Nokia E71 Nokia E71
Pictured, Nokia E71


Nokia E71 Nokia E71
Pictured, Nokia E71


Editor’s comment:


    Nokia E71 is a very classic. The S60 intelligent operating system is very user-friendly, convenient to use, and rich in software resources. However, the Nokia E71 has been on the market for too long, and the author does not recommend that you buy a version modifier. Licensed is the best choice, and it is cost-effective.


Nokia E71 (licensed)
[Reference] 1640 yuan (with ticket)
[SalesMerchant] Beijing Shengtong Innovation Technology Co., Ltd.
[Business phone] 400-810-7771 01062680686
[Store Address] Room 718, Building 1 + 1, No. 10 Caihefang Road, Zhongguancun West District, Haidian District, Beijing



Happy Crazy == Xiaole


    Le Phone uses 1GHz, and the Lenovo Le OS 2.0 system based on the 2.2 system has strong expansion capabilities, especially in multimedia. It has comprehensive support for videos in formats such as RMVB, highlighting multimedia performance. There are also many users who directly call Lenovo Le Phone Le Crazy and Xiaole, which are very popular among domestic smart players.



Lenovo Phone
Pictured, Lenovo Le Phone


    Lenovo Le Phone adopts an all-metal design, the body is very heavy, the feel is more comfortable, and it has a bright red color. The 3.7-inch capacitive touch screen has a resolution of 480 * 800 pixels, and the display effect is clear. Lenovo Le OS system version 2.0 has strong expansion capabilities and rich software resources. The 1GHz processor has good performance, supports 3D graphics accelerator, and multimedia performance is excellent. The rear camera supports video recording. The network fully supports WIFI wireless Internet access, and the network also has it.


Lenovo Phone Lenovo Phone
Pictured, Lenovo Le Phone


Lenovo Phone Lenovo Phone
Pictured, Lenovo Le Phone


Editor’s comment:


    The Lenovo Le Phone uses a lot of metal craftsmanship, and the performance of the whole machine is also very powerful. In particular, the Lenovo Le Phone has made a lot of local optimizations for domestic users. The 1GHz processor performance is good, especially in the playback of RMVB format movies. The advantages of multimedia are obvious. The price of the Lenovo Le Phone is very cost-effective, and friends who like it can consider it.


Lenovo Phone (licensed)
[Reference] 2058 yuan (with ticket)
[SalesMerchant] Jiuteng.com
[Merchant phone] 010-87875610
[Store Address] Shanghai Address: Room 808, No. 80, Fuling Road, Zhabei District, Shanghai
Beijing Address: Room 1201, Block A, Nanxi Building, No. 70, South Third Ring Middle Road, Fengtai District, Beijing
Guangzhou Address: Room 2509, Block A, Longjin Building, No. 528 Longjin Middle Road, Liwan District (Kangwangzhong intersection)











1. Are you satisfied with your existing performance and functionality?
Very satisfied Not very satisfied
2. Are you happy to use a phone supported by Qualcomm Snapdragon chips for stronger performance and more features?
I would love to. Let’s see





Conclusion: The above is an inventory of the eight very popular models at present. They are very popular and have many nicknames due to the attention and use of many netizens. However, the many folk names also make many netizens feel very distressed, and there are many inconveniences when choosing. The above are the various names of these 8 very popular models, including both modified and licensed models. At the same time, we also try to list the names of different users for this machine, hoping to provide some reference for everyone to choose a machine.

Demystifying "The Vanishing Bullet": Ting Feng fights for his life and lingers with Yang Mi semi-naked


Duo poster


Little Skylark (Yang Mi) is injured to help Guo Zhui (Nicholas Tse)


Yang Mi and Nicholas Tse play with passion


Hot-blooded detective Guo Zhui (Nicholas Tse) pursues justice and is not afraid of power

    Movie Network News(Text/Zhang Wei) Produced by Er Dongsheng and directed by Luo Zhiliang, the film will be released on August 14. Liu Qingyun and Nicholas Tse are one-man and one-man, and the two are partners. There are many gun battles in the reasoning, and they work together to track down the "ghost bullet". Yang Mi, on the other hand, offered the largest drama since his debut, half-naked and Nicholas Tse in a passionate play, which can be called the biggest highlight of the film.

Aspect 1: Yang Mi is semi-naked and Nicholas Tse is filming a passionate scene

    In fact, Yang Mi doesn’t have many scenes in the film. He appears as a blind man telling fortunes, and then is chased and rescued by Nicholas Tse. The most interesting part is the large-scale passionate scene she shot with Nicholas Tse. Nicholas Tse rubbed medicine on Yang Mi in his pajamas, and then the two began to kiss and hug. Yang Mi entered the camera half-naked, and Nicholas Tse was also shirtless and very beautiful.

Aspect 2: Nicholas Tse plays the sharpshooter and fights for his life

    Who doesn’t know that Nicholas Tse worked hard to film the scene, but he didn’t get hurt as if he hadn’t filmed this scene before. The scene of the sea of fire was really thrilling. The ammunition warehouse of the arsenal was detonated, and the flames were everywhere. Nicholas Tse was covering for others to rush out of the fire at this time. Director Luo Zhiliang said that in this scene, Nicholas Tse did not use a double, and took the initiative to run past the explosion point without any protective equipment, and the staff were worried for him during filming. In addition to this most dangerous scene, he can often be seen playing the sharpshooter in the film, accurately hitting the enemy’s eyebrows from 50 meters away, and he is always the fastest person when the two draw guns at the same time. Such accurate marksmanship, coupled with Nicholas Tse’s cool expression and handsome gun-holding posture, cannot help but feel that his popularity in the past was inevitable.

Next page:Aspect 3: Liu Qingyun reappears as a detective

Ren Zhengfei gave Yu Chengdong a blow.

This article comes from WeChat WeChat official account:Alphabet list (id: wujicaijing), Author: Zhao Jinjie, brother Yu, title map from: vision china.

The three-year contract of not building a car is about to expire. Just as the outside world is speculating about when Huawei brand cars will be unveiled, Ren Zhengfei stood up and made a final decision: "In the next five years, Huawei will not build a car."

Xu Zhijun, the rotating chairman, confirmed this at the press conference of Huawei’s 2022 annual report on March 31, saying that the five-year period is because the longest validity period of all Huawei documents is only five years."After the five-year deadline has arrived, we will send another five years."

"Huawei’s strategy has not changed. We don’t build cars, help car companies build good cars, and become an incremental component supplier of intelligent networked electric vehicles." Regarding the replacement of Huawei’s brand, Xu Zhijun said, "Some of our departments or some individuals or some partners are abusing Huawei’s brand, and Huawei has been investigating."

In order to prevent Huawei’s brand influence, which has been built for more than 30 years, from being abused, Ren Zhengfei clearly stipulated in the document that Huawei logo can’t be used in combination with automobile trademarks, and "Huawei asks the world" and "HUAWEI AITO" are prohibited. "Huawei is starting to clean up and rectify flagship stores, sales stores and promotional materials that do not meet the requirements." Xu Zhijun said.

This is undoubtedly a blow to Yu Chengdong who wants to lead the radical development of automobile business through Huawei Eco-car. At the launch conference of Huawei P60 series a week ago, Yu Chengdong was still promoting the upcoming M5 advanced intelligent driving version with the help of the brand influence of "Huawei Jiejie".

On March 8 this year, under the leadership of Yu Chengdong, "AITO asking the world" was officially changed to "HUAWEI asking the world", which was regarded by the outside world as an important signal for Huawei to strengthen its leading position in the automobile business.

In the planning of Yu Chengdong, Huawei is the brand of "Huawei Eco-car". By uniting a number of car companies to build eco-alliances belonging to different price segments, Yu Chengdong hopes that Huawei’s auto business will be profitable in 2025.

It is worth noting that in February this year, in the poster released by AITO official blog, the logo was once changed from AITO to HUAWEI, and the external publicity speech was also changed from "Huawei’s deep empowerment" to "Huawei’s overall leadership".

This is not the first time that Ren Zhengfei has "stepped on the brakes" for Huawei’s auto business.

In 2018, after Huawei held its annual strategy meeting in Sanya, Hainan, and decided to "not build cars, but help car companies build good cars", the voice of wanting to build cars was still filled inside. At that time, Xu Zhijun, the rotating chairman of Huawei, was considered as the key to promote Huawei’s smart car BU from scratch. According to the news from the media science and technology forces, Xu Zhijun has been pushing Huawei to enter the automotive field, and even made no secret of his conflict with other executives and even Ren Zhengfei.

One month after Huawei BU was handed over to Yu Chengdong in October 2019, Ren Zhengfei issued the document "Resolution on the Management of Smart Car Parts Business", which made it clear that "whoever proposes to build a car in the future and interferes with the company can be transferred from his post and find another post", and gave a three-year ban period.

In July, 2021, Xu Zhijun revealed that only Yu Chengdong in Huawei was still unconvinced and still wanted to build a car. "But he only had one vote. For Huawei’s senior team, it is clear what to do and what not to do in the survival stage. "

Apart from stopping Yu Chengdong’s radical move, Huawei’s financial difficulties may also be one of the reasons why Ren Zhengfei is unwilling to build more cars.

The financial report shows that Huawei’s revenue in 2022 was 642.3 billion yuan, a year-on-year increase of only 0.9%, and its net profit fell to 35.6 billion yuan, a year-on-year plunge of 68.7%.

Figure/Huawei Financial Report

"In 2023 and for a long time to come, sustainable survival and development will be the core proposition of Huawei’s strategy." Xu Zhijun said.

one

Huawei’s overall revenue is reaching a bottleneck. Since 2017, the growth of the carrier business that started from it has stagnated, with the year-on-year growth rate hovering between -4.03% and 3.8%. In 2022, Huawei achieved sales revenue of 284 billion yuan in the field of operator business, with a year-on-year increase of only 0.9%, which was basically the same.

The terminal business achieved a sales revenue of 214.5 billion yuan in 2022, down 11.9% year-on-year.

The only Huawei enterprise business that can be called substantial growth achieved sales revenue of 133.2 billion yuan, up 30.1% year-on-year, but it only accounted for 20.7% of the total revenue, and it has not yet become a new pillar to support Huawei’s stable development.

Faced with the slowdown of Huawei’s revenue growth, Ren Zhengfei gave an early warning as early as last August, and issued a document entitled "The management policy of the whole company should shift from the pursuit of scale to the pursuit of profit and cash flow", saying that based on the prediction that the global economy will continue to decline in the next decade, it is required to reduce or close those businesses that cannot generate value and profit, and link the promotion and upgrading of bonuses with the operating results, shouting the slogan "Let the chill pass to everyone".

As the only business that Huawei is still losing money, BU, led by Yu Chengdong, bears the brunt.According to the spirit of Ren Zhengfei’s instructions in the document, Huawei’s automobile business will no longer pursue a complete front, reduce the research budget, but also strengthen the closed-loop business and focus on several key components to make competitiveness.

For Ren Zhengfei’s series of adjustment measures, Wu Jianguo, former vice president of Huawei’s human resources, told the alphabet list that the weakening of the global consumer side will inevitably lead to the extension of Huawei’s cycle of coming back to life, which also means that Huawei needs to make greater adjustments than responding to the US crackdown. "(before 2022)It’s not so clear, but now it’s finally guaranteed.(The trend of economic recession)Ren Zhengfei dared to clearly stand up and adjust the strategy. "

Although Car BU is still regarded by Ren Zhengfei as a core project that can maintain strategic investment, under the guidance of the highest policy of bidding farewell to scale growth and turning to profit creation, Huawei’s automobile business obviously can no longer simply change scale with losses, and Yu Chengdong needs to find a balance between growth and making money.

What’s more, from the reality of the development of new car-making forces, except Tesla, the second new car-making company that can achieve annual profit has not yet been born in the world. Even Tesla has experienced high-intensity capital investment for more than ten years. Short-term high losses caused by going off to build a car in person, bothContrary to the pursuit of profit advocated by Ren Zhengfei, it is not allowed by Huawei’s current revenue reality..

two

If we continue to concentrate on building cars, more and more car companies may be wary of Huawei and choose to escape from Huawei.

GAC has become another car company that announced its "breakup" with Huawei.. On the evening of March 27th, Guangzhou Automobile Group announced that the company’s holding subsidiary Guangzhou Automobile Ai ‘an AH8 project was changed from joint development with Huawei to independent development.

This also means that since the two sides reached a joint car-building agreement in 2021, Huawei’s role has changed from the Huawei Inside model of deep cooperation to the most basic component supplier model.

Guangzhou Automobile Ai ‘an’s dissatisfaction with Huawei has long been traceable. At the 19th China Automobile Marketing Summit in August last year, Xiao Yong, deputy general manager of GAC Ai ‘an, once spoke out: "It may not only be batteries, but Huawei is also a big-name supplier, and its price is relatively high and uncontrolled. If we want to cooperate with Huawei, we will find that there is basically no bargaining power."

Xiao Yong said that while maintaining cooperation with Huawei, Guangzhou Automobile is carrying out self-research on battery technology and building a battery factory, and is striving to build a self-research system in terms of core technologies, domain controllers and intelligent cockpits. "Walking on two legs … In the future, 30% of Aeon will conduct self-research and 70% will choose market procurement and cooperation".

There is also SAIC that is far away from Huawei because of fear of losing its dominance.Chen Hong, the chairman of SAIC, who doesn’t want Huawei to be its "soul", made it clear at the 2021 shareholders’ meeting that SAIC can’t accept the overall solution of any supplier, and at most, it will maintain a cooperative relationship.

Even in the eyes of the outside world, Cyrus, which maintains the closest relationship with Huawei, has also started to stand on its own feet.

According to the interface report, Huawei has the initiative in three aspects: all closed-loop data, calibration of important vehicle parameters and main sales channels. The car data related to the world will be uploaded to Huawei first, and Celeste will have to ask Huawei for the demand first if necessary.

In order to enhance the control of data, Cyrus began to set up its own relevant team to collect and analyze data.

On March 30th, Chongqing Sailisi Landian Automobile Co., Ltd., a subsidiary of Sailisi Group, officially released a brand-new new energy vehicle brand-Landian, and launched its first product, Landian E5, which no longer uses Huawei’s electric drive platform and HarmonyOS cockpit.

Instead, it is BYD’s Foday electric hybrid scheme, including 1.5L high-efficiency plug-in special engine and DHT300 electric hybrid system. On the car plane, only HUAWEI HiCar 3.0 is supported, and the HarmonyOS cockpit, which Huawei prides itself on, is no longer adopted by Cyrus.

Obviously, unlike the pursuit of "Chinese content" by the brand in the world, the brand of Blue Power cultivated by Cyrus itself is "going to Huawei".

According to an insider of Celestial, "the sales revenue of the brand in the world is incorporated into the financial report of Celestial listed companies, and Huawei is divided according to the supplier model. Although it seems that Huawei’s participation is very high, in fact, the sharing model is completely based on suppliers. " According to the previously released financial report, in 2022, Sailis expects to achieve a net loss of about 3.5 billion to 3.95 billion yuan, which is significantly larger than the loss of 1.824 billion yuan in the same period of last year, showing a situation of no increase in income.

The more you sell, the more you lose. It is precisely because in the process of cooperation with Huawei, Cyrus has invested excessive funds in R&D and manufacturing. This level of investment exceeds the traditional "foundry model". The bottomless investment makes the cooperation model between Cyrus and Huawei difficult to be copied for a time. The above-mentioned Celeste insiders revealed, "For Huawei, I definitely hope that like Celeste, I can work and actively cooperate, and I am willing to spend more and more money."

In addition, the current sales decline of the car industry has made the car companies waiting to see more hesitant. In December last year, the car industry was able to sell 10,134 cars, but in January this year, it dropped to 4,475 cars by diving. I thought this was affected by the Spring Festival holiday, but in February, the sales volume of the car industry further fell to 3,505 cars. According to insiders of Sailis, "HUAWEI recently changed AITO to Huawei. In fact, there is also a lot of sales pressure. This year, the whole situation has changed a little.(Huawei)Sales can’t go up, and we can’t even talk about going out for negotiations. "

After basically bidding farewell to the orders of new forces such as "Wei Xiaoli", it is obviously more important for Huawei BU, which is determined to be "Bosch" in the new energy era, to make a clear declaration of not making cars, and to win more high-quality cooperation from traditional car companies by dispelling the doubts of partners.

three

Compared with overweight automobile business, it is undoubtedly more urgent and important to maintain the stability of Huawei’s existing business.

Since it was included in the "Entity List" in May 2019, the United States has continuously stepped up its pressure on China enterprises including Huawei: in August 2022, the US Department of Commerce burned EDA software, ultra-wide band-gap semiconductor materials and pressure gain.(PGC)And other four technologies to implement new export controls; At the end of January this year, the United States reached an agreement with the Netherlands and Japan to restrict the export of advanced chip manufacturing equipment to China, further suppressing China’s chip industry chain; In February, Bloomberg, Reuters, etc. broke the news again that the US government is considering cutting off all contacts between American suppliers and Huawei, and stopping issuing licenses of key chip manufacturers such as Intel and Qualcomm, such as 4G, Wi-Fi 6/Wi-Fi 7, artificial intelligence, high-performance computing and cloud projects.

Once these measures are implemented, Huawei will completely cut off the supply from the part before 2023. In addition to the unsustainable development of Huawei’s terminal services such as mobile phones and notebooks, the high-order intelligent driving solution ADS, which is the mainstay of Huawei’s Hi model, will also lose its competitive advantage in the industry because it cannot obtain sustained and stable high-computing chips.

In order to break the technical blockade, Huawei launched a domestic alternative development campaign around three R&D production lines of hardware, software and chip development.

Combined with the recent speeches made by Ren Zhengfei and Xu Zhijun, Huawei has successively completed ERP.(Enterprise Resource Management)Software, and localization of EDA tools above 14nm.

"We completed the replacement development of 13,000+devices and the repeated board replacement development of 4,000+circuit boards in three years … until now, our circuit boards have stabilized because we have domestic parts." Ren Zhengfei said.

However, at the annual report conference on March 31, Xu Zhijun corrected the above information, saying that it was not three years, but it actually took Huawei nearly 10 years to complete some replacement work.

But for Huawei, which wants to return to the leading position in the industry, these alternatives are far from enough.Taking chips as an example, Apple, Samsung, etc. are already matching the 4nm process. For Huawei, which has just broken through the 14nm EDA tool, there are still many key process nodes such as 10nm, 7nm, 5nm, etc., and the smaller the process, the greater the R&D investment resources it consumes.

As Xu Zhijun said, "Although we have made a lot of breakthroughs in product development tools in recent years, we still face many challenges, and there are many product development tools that have not completely broken through, which requires us to work non-stop and redouble our efforts."

The self-developed software business has become one of Huawei’s key breakthrough directions in 2023.

However, Car BU, which was originally born to make up for the deficit caused by the decline of mobile phone business, is still the most promising sector for Huawei to become a new growth point at present, under the circumstance that Huawei’s two revenue pillar terminals BG and operator BG either have a decline in revenue or their revenue reaches a bottleneck.

This may also be the reason why Ren Zhengfei did not directly announce that he would never build a car. After waiting for five years, Huawei solved the problem of localization substitution in the field of software and hardware, and it may not be impossible to put the car on the table in person.

This article comes from WeChat WeChat official account:Alphabet list (id: wujicaijing)Author: Zhao Jinjie, Senior Brother Yu